日韩欧洲精品无码AV,99国产午夜精品一区二区天美,精品久久免费一区二区三区四区,久久综合图区亚洲综合图区,久久久久亚洲AV免费观看,精子网久久国产精品,亚洲AⅤ无码一区二区二三区性色,亚洲精品国产电影,亚洲资源在线观看,婷婷五月丁香在线

  • 
    
  • <ul id="yy6ca"></ul>
  • <del id="yy6ca"></del>
    <ul id="yy6ca"></ul>
    <strike id="yy6ca"><menu id="yy6ca"></menu></strike>
    Hotline:400-880-1556

    English




    Project Introduction

    Contact resistance is the resistance of a current flowing through a closed contact point in time. This type of measurement is performed on components such as connectors, relays, and switches. The contact resistance test can understand the connection quality of the line and its conductive characteristics, to avoid dangerous overheating of the contacts.

    Contact resistance formation principle

    Observe the surface of the connector contact under the microscope. Although the gold layer is very smooth, you can still observe the convex part of 5-10 microns. It will be seen that the contact of the pair of mated contact pieces is not the contact of the entire contact surface, but the contact scattered at some points on the contact surface. The actual contact surface must be smaller than the theoretical contact surface. Depending on the smoothness of the surface and the size of the contact pressure, the gap between the two can be several thousand times.

    The actual contact surface can be divided into two parts: one is the real metal-to-metal direct contact part. That is, the contact microdots without transition resistance between metals, also known as contact spots, are formed after the interface film is destroyed by contact pressure or heat. This part accounts for about 5-10% of the actual contact area. The second is the part that contacts each other after contaminating the film through the contact interface. Because any metal has a tendency to return to the original oxide state.

    In fact, there is no truly clean metal surface in the atmosphere. Even if a very clean metal surface is exposed to the atmosphere, it will quickly form an initial oxide film of a few microns. For example, copper takes only 2-3 minutes, nickel takes about 30 minutes, and aluminum takes only 2-3 seconds to form an oxide film with a thickness of about 2 microns. Even the particularly stable precious metal gold, due to its high surface energy, will form an organic gas adsorption film on its surface. In addition, dust and the like in the atmosphere also form a deposited film on the surface of the contact. Therefore, from the microscopic analysis, any contact surface is a contaminated surface.

    Factors affecting contact resistance

    1. Contact form

    2. Contact pressure

    3. The finish of the contact surface

    4. Stability of contact resistance in long-term work

    5. Temperature

    6. Material properties

    7. Use voltage and current

    Testing requirements

    1. Test with 300V insulation resistance meter.

    2. The contact resistance of the tested product should be less than 1Q.

    3. The test product must be above 5PCS.

    Test description

    1. Qualified contact resistance test does not mean reliable contact. The test proves that it is only used to check whether the static contact resistance is qualified, and it cannot guarantee the reliable use of the contact in a dynamic environment.

    2. The contact resistance is mainly affected by factors such as contact materials and surface conditions.


    Online consultation

    Online consultation

    Recommend
    • COC certification in Algeria

      COC certification in Algeria

      COC certification in Algeria is a mandatory certification for products exported to Algeria, ensuring that the products comply with the country\'s safety, quality, and technical standards. The certification process includes document review, product testing, and factory inspection. Products that pass certification can be legally sold in the local market, protecting consumer interests and promoting fair trade.

    • Saudi Arabia GCC Certification

      Saudi Arabia GCC Certification

      GCC certification is the abbreviation for Gulf Cooperation Council certification, which is a mandatory certification requirement for products entering the market in Saudi Arabia and other countries in the Gulf region.

    • Moroccan COC certification

      Moroccan COC certification

      The Moroccan government implements strict supervision on imported electronic devices, and COC certification is a mandatory requirement to ensure that products comply with local safety, quality, and environmental standards.

    Contact resistance test

    Contact resistance is the resistance of a current flowing through a closed contact point in time. This type of measurement is performed on components such as connectors, relays, and switches. The contact resistance test can understand the connection quality of the line and its conductive characteristics, to avoid dangerous overheating of the contacts.

    Get a quote
    国产一区不卡| 麻豆国产成人AV在线| 丝袜久久| 日本精品99| 国产欧美精品系列在线播放| 欧美成人秋霞久久aa片| 公车上双乳被老汉揉搓玩弄漫画 | 亚洲中文字幕在线第六区| 亚洲欧洲精品无码av| av色综合久久天堂av色综合在| 亚洲人成电影网站色mp4| 欧美另类精品xxxx人妖| japanese熟女俱乐部| 捆绑白丝粉色jk震动捧喷白浆| 欧美日韩综合一区二区三区| 亚洲日本中文字幕乱码中文| 亚洲欧洲日产国码无码久久99| 99久久人妻精品免费一区| 欧洲精品无码一区二区三区在线播放| 成人欧美一区二区三区1314| 一本一本久久a久久综合精品蜜桃 日韩一卡2卡3卡4卡新区亚洲 | 亚洲人成无码电影一区| 国产成人AV一区二区三区不卡| 亚洲精品第一国产综合精品99| 一区一区三区四区产品动漫| av超碰在线播放| 亚洲综合一区国产精品| 国产精品女人高潮毛片| 国产在线无码一区二区三区 | 乱了真实国产在线| 亚洲色欲色欲WWW在线播放| 亚洲偷自拍国综合色帝国| 99V久久综合狠狠综合久久| 日韩精品无码AV中文无码版| 巨大乳bbwsex中国| 西欧free性满足hd| 精品视频一区二区三区在线观看| 亚洲精品无码久久久久久久| 狠狠躁夜夜躁人人爽天天不卡软件| 欧美熟妇色xxxx| 国产成人18黄网站|